For years, Lander University relied on a programmable relay-based system installed in the mid 1980s to provide energy-saving scheduled control of lighting and equipment for its most vital buildings. While the system, which controlled the Learning Center, Cultural Center, Student Center and Athletic Complex, had initially served its purpose, the controls had become antiquated and unreliable. After experiencing numerous disruptions to classes and events, engineers at the state university in Greenwood, S.C., set out to research replacement options.
Engineering Services Department personnel priced equipment and installation costs for a variety of solutions and were delighted to learn about Watt Stopper/Legrand’s unique ability to upgrade older GE panels, retrofitting them with new control engines. For less than ten percent of the cost of a new system, they could refurbish the existing panels and enjoy the benefits of a sophisticated, modern control system. The university could significantly extend the life of its capital equipment and avoid sending materials to a landfill. Additionally, the upgrade would take much less time than a full replacement.